- ENGINEER COMPETENCY
PUWER 1998 turns on a single concept: that work equipment is inspected and maintained by a competent person. The regulations themselves do not give a fixed definition, which leaves duty-holders to decide what “competent” looks like in practice. Get it wrong and an inspection report is worthless — or worse, misleading. This article explains what the HSE expects, and how to verify competence before you accept a report.
Regulation 6 of PUWER requires that work equipment is inspected at suitable intervals by a competent person. The aim is to identify deterioration that could lead to risk and to record the inspection so that the duty-holder has documented evidence of compliance.
HSE guidance describes a competent person as someone with the practical and theoretical knowledge, sufficient experience, and the independence of mind to make an objective judgement on the equipment in front of them. Three threads run through that definition: knowledge, experience and objectivity.
Formal engineering qualifications matter, but they are not enough on their own. A competent person should also have:
A decade inspecting tower cranes does not automatically qualify someone to examine a CNC machining centre. Sector-specific experience is non-negotiable. When you appoint an inspection engineer, ask for examples of similar equipment they have examined in the last 12 months.
A competent person must be free to report defects honestly, without commercial or personal pressure. The strongest signal of objectivity is structural independence: the engineer does not sell the equipment, does not maintain it on a service contract, and is not employed by the duty-holder. An in-house inspector can still be competent, but the duty-holder has to actively manage the conflict of interest.
Practical checks you can apply:
If an HSE inspector queries a report after an incident, the first question they ask is whether the person who wrote it was competent. A weak answer at that point is very expensive.
Every engineer on the ESiNet network is vetted for qualifications, sector experience and independence before they receive client work. You can request an inspection knowing the competent-person question is already answered.
Yes, but the conflict of interest must be managed. The person must be free to report honestly, with no commercial pressure from their employer. For higher-risk equipment, an independent external engineer is usually preferable.
PUWER does not name a single qualification. Competence is judged on the combination of training, qualifications, sector experience and objectivity, against the equipment in question.
PUWER does not specify intervals — they are determined by risk, manufacturer guidance and how the equipment is used. Some duty-holders align PUWER inspections with their LOLER schedule for efficiency.
A written record covering the equipment, the date, the findings, any defects and the person who carried out the inspection. Records should be kept until the next inspection at minimum.
Request an inspection from a vetted independent engineer.
Disclaimer: Inspection delivery follows standardised procedures, with outcomes dependent on equipment condition and statutory requirements.
Sign up our newsletter to get helpful updates news and articles.