Pressure Vessel Inspections: What PSSR Actually Requires of You

Pressure vessels carry some of the highest consequence risks on industrial sites — and they are governed by some of the clearest regulation. PSSR 2000 sets out who must do what, but the detail is in the Written Scheme of Examination. This article cuts through the regulation to what duty-holders actually need to deliver.

What PSSR considers a pressure vessel

A pressure vessel under PSSR is a container designed to hold a relevant fluid above 0.5 bar. That captures air receivers, steam boilers, accumulators, autoclaves, calorifiers, process vessels and a long list of associated equipment. If in doubt, the duty rests with the user to determine scope, with advice from a competent person.

The Written Scheme of Examination

The Written Scheme is the cornerstone of PSSR. It must be in place before the system is used, drawn up or certified by a competent person, and reviewed when the system is modified. The scheme defines:

  • Which items of plant are in scope
  • The nature and extent of examination required
  • The frequency of examination
  • The protective devices and their settings
  • Any preparatory work the user must complete

Frequency

PSSR does not set a single frequency in regulation — the scheme does. In practice, common intervals are:

  • Air receivers: 24 to 48 months
  • Steam boilers: 14 months for the shell; shorter intervals for safety devices
  • Autoclaves: 14 months
  • Process vessels: based on duty, fluid and history

What an examination covers

A competent person examines the pressure-containing components, the protective devices and the supporting structure. Where the vessel has internal access, internal examination is normal practice. Where it does not, non-destructive testing — typically ultrasonic thickness testing — substitutes for direct visual inspection.

Common findings

Across UK manufacturing sites, the most frequent findings are:

  • Wall thinning at the bottom of horizontal receivers where condensate sits
  • Seized safety valves that have not been routinely lifted
  • Pressure gauges out of calibration or with broken movement
  • Drain valves that no longer hold pressure
  • Missing or illegible nameplates and unique identifiers

Preparing for an examination

The duty-holder is responsible for making the vessel safe and accessible for the engineer. That means depressurising, isolating, draining, ventilating where required, and providing safe access. For confined-space entry, permit-to-work and rescue arrangements must be in place before the engineer arrives.

After the examination

A Report of Examination is issued. Any items requiring action within a specified timescale must be addressed before the vessel is returned to service, or within the time stated where action is permitted later. If the engineer flags an immediate risk, the vessel is taken out of service until repaired.

Getting matched with the right engineer

PSSR examinations are sector-specific. ESiNet matches you with a competent person whose experience aligns with your fluid, duty and vessel type.

Frequently asked questions

Does PSSR apply to a small workshop air compressor?

It applies if the system contains a relevant fluid above 0.5 bar — which captures most workshop compressors with a receiver. Below that threshold, PSSR does not apply, though general workplace duties still do.

How often must safety valves be tested?

The Written Scheme of Examination specifies the interval. In practice, safety valves on steam systems are typically tested every 12 months, and on cold receivers every 24 to 48 months.

Can a competent person waive an internal examination?

They can substitute non-destructive testing where internal access is not practicable. The decision is recorded in the Written Scheme and the Report of Examination.

What records do I need to keep for PSSR?

The Written Scheme of Examination, every Report of Examination, and any associated repair or modification records — for the life of the equipment.

Request an inspection, or get in touch to set up a Written Scheme of Examination.