- ENGINEER COMPETENCY
UK health and safety regulations use three different terms — inspection, examination and test — in ways that look interchangeable but are not. Each carries different obligations, different competence requirements and different documentation. Getting them confused is one of the most common reasons sites think they are compliant when they are not. This article clarifies the distinctions.
Different regulations use different terms quite deliberately. The wording determines:
Reading “inspection” in one regulation as if it meant the same as “thorough examination” in another can leave you under-delivering on legal duties.
Generally the broadest and least prescriptive term. Common in PUWER and HSWA. An inspection:
A daily pre-use check by a fork-lift operator is an inspection. A weekly walk-round by a lifting supervisor is an inspection. A formal PUWER inspection by a competent engineer is also an inspection — but with higher rigour.
A more formal, structured activity, usually with prescribed scope and frequency. LOLER and PSSR use “thorough examination” specifically. An examination:
A specific verification activity that produces measurable data. COSHH uses “test” in the context of LEV thorough examination and test. Tests include:
A test forms part of a wider examination in many cases — for example, an LEV examination includes airflow testing, filter testing and containment testing.
A site’s inspection regime should layer all three:
Each layer catches different things. None replaces the others.
Our reporting templates use the right terminology for the regulation in scope, so duty-holders are clear about what was done, what it satisfies and what other activities are still needed.
Request the right form of inspection or examination for your equipment.
The concept is similar — formal examination by a competent person — but the scope and frequency are set differently in each regulation.
Strictly a test, often packaged with a brief inspection of the appliance.
No. It is good practice and required for safe use, but it does not satisfy LOLER thorough examination.
Only if it explicitly states the examination was carried out under LOLER by a competent person.
Disclaimer: Inspection delivery follows standardised procedures, with outcomes dependent on equipment condition and statutory requirements.
Sign up our newsletter to get helpful updates news and articles.