How to Prepare Your Warehouse for a LOLER Thorough Examination

A LOLER examination only delivers value when the engineer can actually examine the equipment. Warehouse sites are particularly prone to access issues — pallets stacked under racking beams, fork-lifts in constant use, mezzanine hoists with loaded platforms. Preparation is half the job. This article sets out the steps that turn an examination day from chaotic to routine.

Before the inspection: documentation

Pull together, in one folder:

  • A current asset register of all lifting equipment and accessories on site
  • Previous Reports of Thorough Examination
  • Manufacturer’s manuals or data plates for each item
  • Maintenance records since the last examination
  • Any defect reports or incident records
  • Your Written Scheme of Examination, if one is in place

The folder should be on site, not at head office, on the day of the visit.

On the day: access and isolation

Plan the route around the warehouse so the engineer can move from item to item without backtracking. For each piece of equipment:

  • Remove loads from the equipment where examination requires it
  • Provide isolation — lock-off where appropriate, with a competent operator available
  • Clear access to chains, hooks, eyebolts, anchor points and structural connections
  • Make working-at-height equipment available for high-mounted hoists and gantries
  • Brief operators on the schedule so production disruption is minimised

Equipment readiness

A few practical points that consistently slow examinations down:

  • Fork-lift trucks — charge or fuel them and have keys available
  • Powered pallet trucks — bring them out of charging bays
  • Slings and accessories — lay them out grouped by location rather than thrown in a bin
  • Mezzanine and platform hoists — clear platforms and have manual override procedures to hand
  • MEWPs and access platforms — ensure they are operational with current daily checks

Staff briefing

The engineer needs a single point of contact who can answer questions, sign permits and authorise isolation. Identify that person in advance and brief operations leads so the engineer is not chasing approvals from team to team.

Common issues that delay examinations

  • Missing keys for fork-lift trucks — almost universal
  • Accessories with no traceable identification
  • Equipment buried under stock that no one can move on the day
  • Recent modifications not documented
  • Battery rooms with locked access and no nominated key-holder

After the inspection

You will receive a Report of Thorough Examination for each item. Read it the same day. Any “immediate” defects mean the equipment is out of service until repaired. “Within X days” defects need a clear close-out plan with named owners. File the reports somewhere your insurer and the HSE can find them — and where the next engineer can read trend data from previous visits.

Building a low-friction rhythm

Sites that handle examinations well treat them like an audit, not a surprise. They review the asset register monthly, keep accessories tagged, and run a 30-minute internal walk-round in the week before each examination. The engineer’s time on site drops, the reports are cleaner, and the chance of a “fail to examine” item goes to zero.

How ESiNet helps

We match you with an engineer whose experience fits your operation, and we work to a consistent standard of preparation, reporting and follow-up across the network.

Frequently asked questions

How much notice does an engineer need before a warehouse LOLER visit?

Two weeks is comfortable, four weeks is ideal. That gives time to compile records, brief operations and clear access. For multi-day examinations, work to the engineer’s diary as far ahead as possible.

Can the engineer examine equipment during normal operations?

Some external checks can be done during operation, but most thorough examinations require the equipment to be available, accessible and isolated. Plan around operational windows where possible.

What happens if an item fails its examination?

It is taken out of service immediately. The Report will specify the defect and any remedial action. Once repaired, the engineer should verify the work before the equipment returns to use.

Do agency or temporary operators need to know about the examination?

Yes. Anyone using the equipment between examinations should know its inspection status and how to report a defect. A short briefing during induction is enough.

Request an inspection or get in touch to schedule your next thorough examination.

Disclaimer: Inspection delivery follows standardised procedures, with outcomes dependent on equipment condition and statutory requirements.