- ENGINEER COMPETENCY
A LOLER examination only delivers value when the engineer can actually examine the equipment. Warehouse sites are particularly prone to access issues — pallets stacked under racking beams, fork-lifts in constant use, mezzanine hoists with loaded platforms. Preparation is half the job. This article sets out the steps that turn an examination day from chaotic to routine.
Pull together, in one folder:
The folder should be on site, not at head office, on the day of the visit.
Plan the route around the warehouse so the engineer can move from item to item without backtracking. For each piece of equipment:
A few practical points that consistently slow examinations down:
The engineer needs a single point of contact who can answer questions, sign permits and authorise isolation. Identify that person in advance and brief operations leads so the engineer is not chasing approvals from team to team.
You will receive a Report of Thorough Examination for each item. Read it the same day. Any “immediate” defects mean the equipment is out of service until repaired. “Within X days” defects need a clear close-out plan with named owners. File the reports somewhere your insurer and the HSE can find them — and where the next engineer can read trend data from previous visits.
Sites that handle examinations well treat them like an audit, not a surprise. They review the asset register monthly, keep accessories tagged, and run a 30-minute internal walk-round in the week before each examination. The engineer’s time on site drops, the reports are cleaner, and the chance of a “fail to examine” item goes to zero.
We match you with an engineer whose experience fits your operation, and we work to a consistent standard of preparation, reporting and follow-up across the network.
Two weeks is comfortable, four weeks is ideal. That gives time to compile records, brief operations and clear access. For multi-day examinations, work to the engineer’s diary as far ahead as possible.
Some external checks can be done during operation, but most thorough examinations require the equipment to be available, accessible and isolated. Plan around operational windows where possible.
It is taken out of service immediately. The Report will specify the defect and any remedial action. Once repaired, the engineer should verify the work before the equipment returns to use.
Yes. Anyone using the equipment between examinations should know its inspection status and how to report a defect. A short briefing during induction is enough.
Request an inspection or get in touch to schedule your next thorough examination.
Disclaimer: Inspection delivery follows standardised procedures, with outcomes dependent on equipment condition and statutory requirements.
Sign up our newsletter to get helpful updates news and articles.