For any business that owns or operates lifting equipment in the UK, LOLER 1998 is non-negotiable. The regulations set out clear minimum intervals for thorough examination — but the practical question is rarely just “how often”. It is also “by whom”, “to what standard”, and “what counts as the start of the clock”. This guide breaks down the default frequencies, the manufacturer-led exceptions, and the events that trigger an examination outside your normal schedule.
LOLER 1998 Regulation 9 requires that lifting equipment is thoroughly examined by a competent person at specified intervals throughout its working life. The frequency depends on what the equipment lifts, how it is used, and what your Written Scheme of Examination specifies.
There are two intervals every duty-holder should know.
Applies to lifting equipment used to lift people, and to lifting accessories. Slings, eyebolts, shackles, hooks, chains and similar accessories all sit in the 6-month bracket, regardless of the load they typically carry.
Applies to all other lifting equipment — fixed cranes, hoists, vehicle lifts, fork-lift trucks, gantries and similar machinery used to move goods or materials rather than people.
If the manufacturer specifies a shorter interval, or the equipment is used in a particularly demanding environment, your competent person may set a more frequent schedule through a Written Scheme of Examination. Heavy-duty cranes in steelworks, salt-air harbour cranes, or hoists in food production lines often warrant tighter intervals than the statutory minimum.
LOLER 9(3) requires a fresh thorough examination after any event likely to have affected the equipment’s safety — for example a collision, an overload, a long period out of service, or a re-installation at a new location. Treat these as automatic triggers, not optional. A new Report of Thorough Examination must be in place before the equipment returns to use.
A Written Scheme of Examination is a tailored programme drawn up by a competent person. It defines what is examined, how, and when. For complex sites with mixed lifting plant, a scheme is often the cleanest way to keep frequencies, records and responsibilities organised — and to align manufacturer recommendations with statutory minimums.
Equipment without a current Report of Thorough Examination should not be used. Operating it puts you in breach of LOLER and creates clear liability if anything goes wrong. The HSE can issue Improvement or Prohibition Notices, and in serious cases prosecutions follow. Insurance cover may also be void.
ESiNet connects you with independent inspection engineers across the UK who deliver LOLER thorough examinations to a consistent, transparent standard. Whether you need a single examination or a full Written Scheme, we will match you with a competent engineer for your equipment and sector.
The clock runs from the date of the last thorough examination, not the calendar year. If a fork-lift was examined on 15 March, the next is due by 15 March the following year.
They can, but it raises a clear conflict of interest. HSE guidance is that the competent person should be objective and free from commercial pressure. An independent examiner reduces this risk and is normally preferred by insurers.
Yes. LOLER requires a thorough examination before equipment is put into service for the first time, unless a current Declaration of Conformity covers the relevant period and the manufacturer has carried out the examination.
The hire company is responsible for examination before delivery and for supplying the Report. As the user, you should check that the Report is current and covers the configuration you are using on site.
Request an inspection today and stay ahead of your statutory dates.