- ENGINEER COMPETENCY
Cranes and hoists are the most consequential lifting equipment on most sites — and they attract the most attention from HSE inspectors. The LOLER framework around them is well-defined, but the day-to-day discipline around frequency, records and visible warning signs is where compliance is actually won or lost.
For cranes and hoists, two intervals matter:
Within those defaults, your Written Scheme of Examination can specify shorter intervals based on duty cycle, environment or manufacturer guidance.
The line between a “goods” and a “persons” lift is often misunderstood. If the equipment is rated and used solely for goods, the 12-month interval applies. The moment someone rides on it — even occasionally, even with a “platform” attachment — the 6-month rule applies, and the equipment specification must support carrying people. Retrofitting a goods hoist with a person-rated cage requires a re-examination and a scheme update.
Each examination produces a Report of Thorough Examination. The duty-holder must:
Records should live with the equipment, not in a head-office filing cabinet. A QR-code label tied to a digital record is increasingly common and works well.
Operators are your first line of defence between formal examinations. Train them to stop the equipment and report:
Each of these warrants taking the equipment out of service and getting a competent person to it before resuming.
LOLER places a positive duty on the competent person to report serious defects to the enforcing authority. Duty-holders should expect that — and act on the same defect immediately, regardless of whether the engineer also notifies the HSE.
Across the cranes and hoists we see across the network, four causes recur:
None require advanced engineering to spot. They require operator training and a culture that takes early warning signs seriously.
A site that handles crane and hoist LOLER well does five things consistently:
We match sites with independent inspection engineers who deliver examinations to a consistent reporting standard, and who feed defect trend data back to duty-holders. That turns LOLER from an annual administrative event into an active risk control.
Yes. The 12-month clock runs regardless of usage. If the crane has been out of use for an extended period, LOLER 9(3) also triggers a fresh examination before it returns to service.
The same 12-month rule applies. The control system itself is part of the examination, including emergency stop behaviour and limit-switch performance.
Visual examination along the full length, with checks for broken wires, corrosion, kinks, birdcaging and reductions in diameter. The engineer will reference standards such as BS ISO 4309 for limit values.
No. Pre-use inspection by the operator is separate from the LOLER thorough examination. Both are needed — pre-use checks pick up daily issues, the thorough examination is the statutory check by a competent person.
Request an inspection of your cranes, hoists or lifting accessories.
Disclaimer: Inspection delivery follows standardised procedures, with outcomes dependent on equipment condition and statutory requirements.
Sign up our newsletter to get helpful updates news and articles.