COSHH 2002 covers any hazardous substance encountered at work — from welding fume to coolants, solvents, dusts and biological agents. For manufacturers, the regulation’s bite is felt mostly in two areas: local exhaust ventilation (LEV) testing and respiratory protective equipment (RPE) checks. This checklist sets out what a thorough COSHH inspection should cover and what to have ready before an engineer visits.

What COSHH 2002 requires

The regulations require employers to assess the risk from hazardous substances and put controls in place that are adequate and properly maintained. Regulation 9 specifies that engineering controls — typically LEV — must be examined and tested at suitable intervals by a competent person.

LEV thorough examination and test

LEV systems must be thoroughly examined and tested at least every 14 months. In practice, most manufacturers run a 12-month cycle to keep the date the same every year. The examination should cover:

  • Visual condition of hoods, ductwork and stack
  • Airflow measurements at each capture point, against the original commissioning data
  • Filter condition and pressure drop
  • Fan performance and motor condition
  • Discharge arrangements and any re-circulation

A good report does not just record a pass or fail — it gives you trend data against previous tests so deterioration can be spotted early.

RPE — face fit and condition

Where LEV alone is not enough, RPE is the next line. COSHH requires that tight-fitting RPE is face-fit tested for every user, that records are kept, and that equipment is inspected before each use. For sites running half-mask reusable respirators, monthly checks on valves, straps and filters are good practice.

Substance inventory and risk assessments

Every COSHH inspection should start from your substance inventory. Common gaps we see:

  • New substances introduced without an updated assessment
  • Old assessments referencing CHIP rather than CLP labelling — an immediate red flag
  • Cleaning chemicals omitted entirely because they sit in a different cupboard
  • Welding fume treated as a single line rather than broken down by process

Practical pre-inspection checklist

Pull together before the engineer arrives:

  • LEV commissioning report — the baseline against which performance is measured
  • Previous LEV examination reports
  • Substance inventory with current safety data sheets
  • RPE face-fit records, by user and by mask model
  • Maintenance logs for fans, filters and ductwork cleaning
  • Records of any process changes since the last inspection

What “competent” means for COSHH

LEV competence requires a P601 qualification or equivalent. RPE face-fit testers should hold Fit2Fit accreditation. ESiNet only matches you with engineers carrying the right accreditations for the work in scope.

Acting on findings

The value of a COSHH inspection is in what you do with the report. Treat findings as a maintenance backlog, not paperwork. Close out high-risk findings within days, not months.

Frequently asked questions

How is the 14-month LEV interval calculated?

From the date of the previous thorough examination and test. The 14-month maximum gives flexibility to align inspections with shutdown periods, but the absolute limit cannot be exceeded.

Does COSHH apply to office cleaning chemicals?

Yes. COSHH covers any hazardous substance, regardless of setting. Office cleaning regimes need risk assessments and proportionate controls — usually administrative rather than engineering.

Do I need face-fit testing if my employees wear loose-fitting RPE?

No. Face-fit testing is required only for tight-fitting RPE. Loose-fitting RPE — powered hoods and helmets — relies on supplied air rather than seal, and is fit-tested differently.

What is the difference between LEV maintenance and LEV thorough examination?

Maintenance keeps the system running. Thorough examination is a formal statutory test by a competent person to verify performance against commissioning data, producing a written report.

Request an inspection to keep your COSHH controls and records current.

Disclaimer: Inspection delivery follows standardised procedures, with outcomes dependent on equipment condition and statutory requirements.