Construction sites concentrate more lifting equipment, in more configurations, used by more contractors, than almost any other UK environment. LOLER applies to every piece of it — from tower cranes to teleporters, slings to safety harnesses. For site managers, that breadth is exactly the challenge. This guide sets out a practical approach to LOLER compliance on a live construction site.
Under CDM 2015 and the wider HSWA framework, the principal contractor is responsible for ensuring statutory inspection of all lifting equipment used on site, regardless of which subcontractor owns it. That responsibility cannot be subcontracted away by relying on someone else’s paperwork — but it can be discharged by a clear system.
Before any contractor brings lifting equipment on site, they should provide:
Site induction should not complete without these records on file.
Construction sites change daily. Equipment is moved, configured, attached to different loads. A LOLER report issued a month ago covers the equipment, but not the daily reality. Build in:
Every non-routine lift needs a lifting plan signed off by the Appointed Person. The plan references the equipment, its rated capacity, the load, the environment and the LOLER status of every piece involved. This is where statutory inspection and operational safety intersect.
Tower cranes have the most prescriptive regime: 12-month thorough examination, supplemented by ongoing inspection by competent operators and erection or dismantling oversight by a competent person. Wire ropes, slewing rings, structural connections and electrical systems all warrant specific attention. Many sites use a dedicated crane safety coordinator.
Most construction lifting equipment is hired. The hire company is responsible for examination before delivery and for supplying the report — but the duty to operate compliantly transfers to the site once delivered. Check the report on receipt; do not assume it.
Slings, shackles, eyebolts, chains and other lifting accessories all need 6-monthly thorough examination. They are the most easily missed equipment on site because they move between teams and storage points. A tagged identification system and central storage drives discipline here.
Every site should have a single, well-known defect reporting route. When an operator stops work on a piece of lifting equipment, the equipment goes out of service, a tag goes on, and an engineer attends. Operators who report defects should be visibly supported, not penalised.
At project end, the LOLER paperwork for site-owned equipment transfers with the asset. For hired equipment, records remain with the hire company. Either way, the principal contractor should leave the site with a clean record of every lifting examination during the project.
We support construction sites with thorough examinations across the full lifting inventory — tower cranes, MEWPs, teleporters, hoists, accessories — to a consistent standard.
Request an inspection or get in touch for site-wide LOLER support.
No. CDM sits alongside LOLER and clarifies coordination duties. LOLER duties are separate and remain with the duty-holder.
A specialist crane inspection engineer with documented experience on the specific crane type, typically holding LEEA or sector-equivalent accreditation.
MEWPs that lift people fall in the 6-month bracket. The same applies to mast climbers and personnel hoists.
Their equipment should not be permitted on site. The principal contractor has the right and the duty to verify compliance before equipment is used.
Disclaimer: Inspection delivery follows standardised procedures, with outcomes dependent on equipment condition and statutory requirements.